The first Solution to Solve Mold Cracking, Erosion

  Grind the mold area and create a new sprue well by enlarging the old one- This practice is only a temporary cure yielding mixed results. Though the mold is repaired,  it will eventually succumb to the same fate. It also is important to note that the mold only can be ground to within a reasonable length (usually from 2.75-3 in. of the mold edge) to ensure against leakage. If this distance has been compromised, the mold must be scrapped. In addition, if the choke is located in the sprue, it also may be burned. Grinding and enlarging will eliminate the predetermined ratio between the choke and other elements of the gating system. 

 

 

 

About First-rate Mold Solution Co., Ltd.
First-rate Mold Solution Co., Ltd. in China, provide industry design,mold design,mold manufacturing,molding analysis,project management service.

 About www.firstratemold.com
our website has a lot of professional knowledges in mold industry in blog and news, also we are interested in CAD/CAM/CAE, such as AUTOCAD,UGNX, PRO/E,CATIA, CIMATRON, SOLIDWORKS, MOLDFLOW and so on,we welcome professional engineer,mold maker and someone who are interested in injection molding,plastic product,injection mold and mold industry to our section of blog and news,we would like to share with them